OrbitraSCOUT

OrbitraSCOUT, the 30 September build

Every screen below says which of two things it is: in the build that goes live on 30 September, or October work shown and marked. The line under each row says what puts it there. 6 screens and states are marked October.

This is a design, not a commitment, and the brand on it is a placeholder. A screen marked BUILT is drawn and dressed. A screen marked BLANK carries the real top bar, the real side rail, a title, one line saying what the page is for, and its buttons as working links, and nothing else until it is designed.

Start the walk-through

The way in

Sign up, agree to the terms, and the desk. It ends on the product. On 30 September the first companies are invited and checked by hand, so this is reached from an invitation; a company joining from the open web on its own comes later.

In the 30 September build

What the software does on the day it goes live. This is the backbone of the walk-through: every screen here is shown as working software.

October, shown and marked

Reachable, and marked on every row, so each one can be shown and named as what comes next rather than as what is there on day one.

Kept for reference, in neither story

Superseded or retired screens, still on disk and still reachable. Taking a screen out of the walk-through never means deleting the file.

Named by the plan, with no screen in this set

Either it is not a screen at all, or it is later work that nobody has drawn yet. Listed so the gap is visible rather than assumed.